Fullerton Building Systems Inc.
Testimonials
Home | About Us | Restaurants | Convenience Stores | Commercial Buildings | Manufacturing Process | Factory Applied Wall Finishes | Press Room | Testimonials | Request Information | Contact Us | Links


maxerma.jpg

Max & Erma's Restaurants, Inc. 

"I have known and worked with Fullerton Building Systems since the 1980’s when I developed a panelized building system for a former employer. At Max & Erma’s we operate over 75 company owned restaurants, and in recent years have launched a franchise program.

About 3 years ago we developed a new design to simplify construction procedures to help us control costs through greater efficiency. Fullerton played a significant role in helping us meet our objective. 

We have built several corporate and franchise stores with Fullerton Building Systems. 

Currently we’re working on a new prototype, and as a ‘work in progress’, we have found that Fullerton Building Systems offers flexibility in design and quality in manufacturing, and that has helped maintain critical new opening schedules. 

Fullerton Building Systems is definitely in our future building plans.” 

Larry Fournier---Max & Erma’s Restaurants, Inc.
Director of Engineering & Construction


rwmercer.jpg

R.W. Mercer 

“Fullerton Building Systems help us control our construction costs. 

As a general contractor focused on new construction of convenience stores, strip malls and restaurants, meeting our customer’s schedules is critical. Speed of construction is important to us. Fullerton Building Systems’ manufacturing methods help us control and shorten the job site construction phase which means our clients can schedule openings sooner and start getting payback on their investment much quicker.

Because Fullerton Building Systems’ panels come with the exterior finish applied winter construction is simplified and can be done in just about any weather condition and without specialty construction crews. A big time saver. 

What I really like is the responsiveness of the entire Fullerton Building Systems team. They are in our future building plans.” 

Tim Poling, Senior Project Manger, R.W.Mercer


bailyco.jpg

The Bailey Company 

“We choose Fullerton Building Systems to provide our exterior shells because we achieve cleaner, faster construction and end up with a straighter building. We spec the factory-applied stucco because it’s better than job site applied. And that’s just one of the innovative methods that help produce a significant savings over a stick built project. Our experience? We’re very satisfied.” 

Pat Kloberdanz, Director of Construction, The Bailey Company


zabestpict.jpg

Zabest Commercial Group 

“A number of years ago we were using a different panel and building component manufacturer. Inconsistent quality was an issue. In searching for more quality and consistency, I remembered the good experience we had with Fullerton Building Systems on a previous project. We’ve been working with Fullerton ever since and our relationship has grown stronger. 

Besides enjoying great communication with their design department, the quality of lumber and precise panel and component manufacturing cannot be beat. We have a number of projects in the pipeline right now that we’ll be building with Fullerton. We’re very happy! 

Steve Nikolas, Owner, Zabest Commercial Group


havtech.jpg

Wesley Noble---H.A.V. Tech 

“My experience with the Fullerton Building Systems has been great---they have exceeded my expectations. Our objective is to get the shell up and the project enclosed as fast as possible. Because of their excellent up front planning and onsite organization, our 4000 square foot Lebanon OH, LaRosa Restaurant project was completely erected and enclosed in 3-1/2 days! You can bet we’ll use Fullerton Building Systems again.” 

Wesley Noble, H.A.V. Tech Vice President



skelly.jpg

Bill Skelly---Skelly Construction 

“At Skelly Construction our projects range from 4-Plexes to Hotels to Strip Malls. The consistent quality coming out of Fullerton’s factory is important because of the precise fit of the components, we reduce the time of on-site construction---helping us realize cost savings over stick built projects---keeps us competitive.”

 “…can’t say enough good things about Fullerton Building systems.”

Bill Skelly, Skelly Construction


primeagencylemarsa.jpg

John Grassenheider---Prime Agency LLC

 “We use 3rd party architects to produce our plan. Fullerton’s design department uses these plans to create clear and concise shop drawings and detail on-site assembly plans that expedite the construction---it’s a value-added service we really appreciate.” 

John Grassenheider---Prime Agency LLC


fausthowell.jpg

Harlan Faust---Faust Howell Associates 

“As an architectural firm we’ve known about Fullerton Building Systems for some time. Fullerton provides consistent quality through manufacturing, resulting in helping our clients realize profit through construction time saving efficiencies.”

 Harlan Faust---Faust Howell Associates


Fullerton Building Systems, Inc.
34620 25oth Street / PO Box 308
Worthington, Minnesota 56187
800-450-9782 / 507-376-3128 / Fax: 507-376-9530